Special-assignments minister considered for new Latvian government to tackle transport issues such as Rail Baltica
During talks on forming Latvia's next government, the idea of appointing a special-assignments minister to deal with long-standing transport problems has been discussed, Kučinskis said. Prime ministerial candidate Andris Kulbergs still has to present the idea to the AS parliamentary group.

Negotiators forming Latvia's next government have discussed creating a special-assignments minister post that would temporarily handle accumulated problems in the transport sector, including the "Rail Baltica" railway project. Kučinskis disclosed this. Such a post could help the new government deal with the sector's most troublesome issues.
Kučinskis said "internal talks" had considered whether someone should be appointed for a limited time to resolve the transport sector's pressing problems. He noted that the Ministry of Transport has very demanding functions but low capacity, which prompted the idea. Andris Kulbergs (AS), the candidate for prime minister, still has to present the proposal to the AS parliamentary group.
Kulbergs had earlier said the government might include non-party professionals, but he had not named any individuals or sectors. Asked to specify, Kučinskis mentioned finance, health and economy. On Sunday Kulbergs announced that AS and NA had agreed to cooperate in forming the government and on areas of responsibility. NA was invited to nominate candidates for ministerial posts in the interior, welfare and culture fields.
Rail Baltica background
It was previously reported that in its first phase in Latvia, "Rail Baltica" is planned to include a cross-border link from Lithuania to the Estonian border, plus completion of works at Riga Airport and in the southern part of Riga Central Station. The so-called "Riga loop" is not part of the first phase.
First-phase costs in the Baltics could reach 14.3 billion euros, of which 5.5 billion in Latvia, or about six billion after indexation. Total project costs in the Baltics may reach 23.8 billion euros, while a 2017 analysis estimated 5.8 billion. The project envisages a 870-kilometre European-gauge (1435 mm) railway with a top train speed of 240 kilometres per hour.


