Bavarian court rules against farmer's planned barn over site choice

The Munich Administrative Court dismissed a Bavarian farmer's claim against a building authority that refused permission for a barn for suckler cows and sheep. The ruling shows that even farmers must convincingly justify why a building must stand at the chosen location.

Foto: agrarheute (Vācija)

A farmer in Bavaria, a federal state of Germany, has lost his court case over a new barn. The Munich Administrative Court (case no. M 1 K 21.2226) sided with the building authority, which had refused a permit for a barn for suckler cows and sheep. The ruling matters to other farmers because it shows how strictly construction outside built-up areas is assessed.

What was planned

The farmer applied in 2017. The building was to house ten suckler cows with their offspring and up to 20 sheep, plus a hay bale store, and measure 26.30 by 14.40 metres. The farm is run as a side business and covers 23.27 hectares of farmland and 4.13 hectares of forest. The barn was to stand 130 metres from a farmstead that was unoccupied at the time, next to a machinery shed, a manure store with a slurry pit and a hay store. The location was chosen to keep distances to the manure store short.

The Bavarian office for food, agriculture and forestry backed the plan, but the building authority rejected the application in 2021.

Why the court disagreed

Section 35 of the German Building Code allows privileged building outside settlements if a structure serves a farm. The court left open whether this was a farm at all, but doubted that this particular barn would serve it. The key question was whether a reasonable farmer in comparable circumstances would build it in this form and at this site.

The court noted that the farmstead had been unoccupied since the claimant bought it. Paving stones, gravel, pallets and rubble, linked to unauthorised commercial use, lay between the planned site and the existing buildings. In the judges' view, the barn could be built closer to them. They did not accept the farmer's argument about a high-pressure gas pipeline, and found that other sites had not been adequately examined. They also feared scattered development and harm to the landscape and its recreational value.

What it means for others

The ruling sets no general distance limit: 130 metres is not an obstacle in itself, and permanent residence on site is not required. A favourable opinion from the agricultural office does not guarantee a permit either. Before applying, farmers should document why the building is needed, how it fits existing buildings and what alternative sites were considered.