Friday, 28 August 2026
Rīga TV

World and Latvian news in one place

LatviaPublished: 28 August 2026 at 22:18

Minister's proposal for backup 2G network mocked on social media

Economy Minister Viktors Valainis's idea to build a backup 2G network for crises after the recent storm has drawn ironic criticism online, since the new network would also need electricity. Critics say existing towers should get generators instead.

Foto: Jauns.lv

Following communication outages caused by a recent devastating storm, Economy Minister Viktors Valainis (ZZS) proposed building a separate 2G network for crisis situations, based on the infrastructure of state grid operator "Sadales tīkls". According to the minister, such a network would let the state avoid relying solely on private mobile operators' preparedness, and could reportedly be built without major investment. It would be intended only for voice calls, not internet access.

Valainis explained that the storm revealed weaknesses in operators' backup batteries and showed that infrastructure is not sufficiently prepared for prolonged power outages.

Backlash on social media

The proposal met sharp, often ironic criticism online. Many users pointed to an obvious contradiction: a new 2G network would still require electricity, meaning it would not solve the problem that arose when power itself was lost. Several commenters argued the priority should instead be equipping existing mobile towers with generators, solar panels, or other autonomous power sources rather than building an entirely new system.

Commenters also noted that 2G service in Latvia has not been fully phased out — operator "Tele2" confirmed that calls and text messages can still be made over its 2G network. Some reactions were purely ironic, including suggestions to revive carrier pigeon post.

Alternative proposal from Sadales tīkls

"Sadales tīkls" itself has proposed evaluating a separate radio communication network in the 450 MHz frequency band for critical infrastructure needs. Unlike the minister's proposed 2G network, this system would be designed with powerful batteries and diesel generators, allowing communications to be maintained for several days even without grid power.

Meanwhile, residents have shared their own experiences from the storm's aftermath — one resident of Kaplava parish in Krāslava municipality said she went three days without communications and nearly six days without electricity.

Comments

0/1500

Comments are automatically moderated. No hate, threats, personal data or spam.

Loading comments…

More in this category